ERP

ERP Project Manager vs ERP Consultant: Same Project, Different Jobs

Both sit inside an ERP project, but they are responsible for different things: one manages the project as a whole, the other makes sure the system is set up correctly. A short note that sums up the difference under seven headings and asks when the two roles can sit with one person.

3 min
Methodology

Spike: Time-Boxing Uncertainty in Agile Projects

Instead of trying to estimate work that can’t be estimated, first do a time-limited investigation to learn the unknown. What a spike is in Agile/Scrum teams, how to write one, where it helps in ERP projects and where it gets misused.

6 min
Methodology

CTQ: Turning “Make It Good” into a Measurable Criterion

In ERP projects, expectations are usually written as “it should be fast, it should be accurate”. CTQ is the step that turns those sentences into criteria with a unit, a target and a limit — and at the end of the project, it is what decides who was right.

7 min
Methodology

DMADV: Designing a Process That Doesn’t Exist Yet

DMAIC improves an existing process. But what if there is no process to improve? For a new plant, a new business unit or a first ERP implementation, the path is DMADV: Define, Measure, Analyse, Design, Verify.

7 min
Methodology

Six Sigma and ERP: Which Parts Actually Help?

Six Sigma is a manufacturing-born, statistics-heavy approach. Implementing all of it is unnecessary for most companies; but some of its parts are directly useful in a company that runs an ERP.

6 min
Methodology

Why We Use the Ishikawa (Fishbone) Diagram

We favour the fishbone diagram both in our methodology and in our analysis work. The reason is simple: we are looking for the root of a problem, not its symptom — and we want to find it together with the team.

5 min
ERP

ERP and Accounting

Most Turkish ERPs were designed from an accounting background, while IFS and SAP were designed from a cost accounting background. The technical difference between a single-axis account code and a multi-axis dimension structure, and its practical consequences.

7 min
IFS

Key Differences Between WBS and CBS in IFS

What are the Work Breakdown Structure (WBS) and the Cost Breakdown Structure (CBS) for in IFS projects, and which is used where? A comparison under five headings: focus, components, scheduling, accounting and budgeting.

4 min
Oracle

Oracle Performance: Check These First

Eight things to check on a slow Oracle database before buying bigger hardware — the steps that work best in the field, from diagnosis to index strategy.